[1]
Sudarsono, I.S.A. et al. 2026. Analisis Akurasi Volume Dan Biaya Pekerjaan Struktur Antara Metode Konvensional Dan Bim 5d (Studi Kasus Proyek Pembangunan Gedung Mako Batalyon T900 Brimob Polda KALTIM). Indonesian Journal of Innovation Science and Knowledge. 3, 3 (Jul. 2026), 2463–2473. DOI:https://doi.org/10.31004/ijisk.v3i3.534.